WPCC Plant Bypass
Plant Bypass Location
WE- WPCC
221 Erie rd
Eastlake, Oh
At Outfall located in Lake Erie 1500′ from shore at 41-40.717 81-26.714
Start time- 8:45 PM on 8-23-2023
End time 6:47 AM 8-24-2023
Flow- 4.145 MG
Erie Road Equalization Tank
37201 Erie Road
Willoughby, OH
Start: 9:45 PM 8-23-2023
Stop: 1:53 AM 8-24-2023
Flow: 0.365 MG
Quentin Road Pump Station
33385 Lakeshore Blvd
Eastlake ,OH
Overflow to a storm sewer to Lake Erie
Start: 8:19 PM 8-23-2023
Stop: 8:57 PM 8-23-2023
Flow: 0.001 MG
East Island
241 Forest Dr
Eastlake, OH
Overflow to a Storm Sewer to Chagrin River
Start: 8:02 PM 8-23-2023
Stop: 12:38 AM 8-24-2023
Flow: 0.726 MG
Additional Information: Rainfall of 2.75 ″ over with 1.97″ falling in 1 1/2 hours, system and capacity exceeded
WE- WPCC
221 Erie rd
Eastlake, Oh
At Outfall located in Lake Erie 1500′ from shore at 41-40.717 81-26.714
Start time- 2:15 AM 8-25-2023
End time 6:35 AM 8-25-2023
Flow- 0.618MG
Additional Information: Rainfall of 0.89 ″ over falling in 3 1/4 hours after 2.75 ” on previous day.